The GATE Grind

GATE 2023 AR — Planning – Question 59

Urban Land Use and Transportation · Pedestrian and non-motorized transport planning · 2 marks · Multiple choice

Under IRC 11:1962, cycle tracks are warranted for P cycle traffic at least 400/hour with motor traffic 100–200/hour; Q cycle traffic at least 100/hour with motor traffic above 200/hour; R cycle traffic 100–200/hour with motor traffic 100–200/hour. Which combinations apply?

  1. P and Q
  2. P and R
  3. Only R
  4. P, Q and R

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: (A) P and Q

Explanation

The historical warrant table cited accepts the higher cycle-flow case P and the higher motor-flow case Q. The lower-flow combination R does not reach the listed warrant. Therefore A. These are the 1962 source criteria, not a replacement for contemporary project-specific design assessment.

More Pedestrian and non-motorized transport planning questions

All Pedestrian and non-motorized transport planning questions →