In a residential complex, the central play area is to be converted into a detention pond for stormwater management. For a 24-hour rainfall event of 100 mm, 100% of stormwater from the central play area and 70% of stormwater runoff from the rest of the complex is to be held at the detention pond. The required pond depth (in mm) is _____.
| Surface type | Area (m$^2$) | Runoff coefficient |
|---|---|---|
| Apartment blocks | 1250 | 0.80 |
| Central play area | 150 | 0.60 |
| Other permeable areas | 200 | 0.70 |
| Other impermeable areas | 400 | 0.90 |
Practise this question in The GATE Grind →
Show answer and explanation
Correct answer: 760 to 760
Explanation
We are sorry we couldn't write detailed soluition for this, we are working on it!, please consider asking your own AI, its just 2-3 clicks with very minimum effort