GATE 2018 PI – Question 34
A pressure die casting set-up was tested by injecting water (density 1000 kg/m3) at a pressure
of 200 bar. Mould-filling time was found to be 0.05 s. Afterwards, the actual casting is made
by injecting the liquid metal (density 2000 kg/m3) at an injection pressure of 400 bar. Neglect
all losses (friction, viscous-effect, etc.). The approximate mould-filling time (in s) is
Practise this question in The GATE Grind →
Show answer and explanation
Correct answer: (A) 0.05
Explanation
We are sorry we couldn't write detailed soluition for this, we are working on it!, please consider asking your own AI, its just 2-3 clicks with very minimum effort