GATE 2019 CE (CE1) – Question 31

Traffic Engineering and Transportation Planning · Traffic studies: flow, speed, peak hour factor, accident study · 1 mark · Numerical answer

The maximum vehicle count in any five-minute interval of the peak hour is 160; total hourly flow is 1000 vehicles. Find the five-minute peak-hour factor, to two decimal places.

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: .51 to .53

Explanation

An hour contains twelve five-minute intervals. Peak-hour factor is $$\mathrm{PHF}=\frac{1000}{12(160)}=0.520833.$$ Rounded answer **0.52**.