- GATE 2018 CE (CE2) Q52 – A 25 m cable PQ is supported at equal levels 20 m horizontally apart. A 150 kN point load acts at R, dividing the cable into equal lengths, as shown.…
- GATE 2020 CE (CE1) Q29 – The shown planar elastic parabolic structure has span 8.0 m, rise 2.4 m and uniformly distributed load 12 kN/m. Neglect self-weight. Find maximum…
- GATE 2021 CE (CE2) Q49 – Cable EFGH has horizontal spans EF,FG,GH each 2 m. F is 3 m below E; H is 1 m below E. Downward loads at F,G are 10,12 kN. Find tension magnitude in…