The GATE Grind

GATE Water and Waste Water Quality and Treatment: Sewerage system design and quantity of domestic wastewater – Previous Year Questions

3 GATE previous year questions on Sewerage system design and quantity of domestic wastewater (Water and Waste Water Quality and Treatment, Civil Engineering) with answers and explanations, from every paper.

3 questions worth 4 marks in all (2 1-mark, 1 2-mark). Asked between 2016 and 2026, so you can see how the topic has been tested over time.

  1. GATE 2016 CE (CE1) Q28 (1 mark, Multiple choice) – Crown corrosion in a reinforced concrete sewer is caused by:
  2. GATE 2025 CE (CE2) Q17 (1 mark, Multiple choice) – The bacteria mainly responsible for crown corrosion in a sewer is .
  3. GATE 2026 CE (CE1) Q44 (2 marks, Multiple choice) – The average sewage from a city is 90 million litres per day and the average 5-day Biochemical Oxygen Demand (BOD 5) is 300 mg/l. Average standard BOD…