GATE Plant Design and Economics: Process economics and cost estimation – Previous Year Questions
6 GATE previous year questions on Process economics and cost estimation (Plant Design and Economics, Chemical Engineering) with answers and explanations, from every paper.
6 questions worth 9 marks in all (3 1-mark, 3 2-mark). Asked between 2019 and 2025, so you can see how the topic has been tested over time.
- GATE 2019 CH Q64 – Equipment A costs Rs 80,000, has yearly operating cost Rs 20,000 and life 4 years. Equipment B costs Rs 1,60,000 with yearly operating cost Rs 15,000.…
- GATE 2020 CH Q25 – A phenol plant produces 100 metric tons/year at full capacity. Selling price is INR 200/kg, production cost INR 50/kg, and annual fixed charges,…
- GATE 2021 CH Q23 – Turnover ratio is defined as
- GATE 2021 CH Q64 – Operating labor requirements L in the chemical process industry is described in terms of the plant capacity C (kg/day) over a wide range (103–106) by…
- GATE 2023 CH Q64 – The purchase cost of a new distillation column is Rs. 10 lakhs with an installation factor of 5.8. The cost of the capital is to be annualized over a…
- GATE 2025 CH Q26 – The capital cost (CC) of an industrial equipment varies with its capacity (S) as CC S. The rule-of-thumb value of the exponent is