  1. GATE 2019 CH Q64 (2 marks, Numerical answer) – Equipment A costs Rs 80,000, has yearly operating cost Rs 20,000 and life 4 years. Equipment B costs Rs 1,60,000 with yearly operating cost Rs 15,000.…
  2. GATE 2020 CH Q25 (1 mark, Multiple choice) – A phenol plant produces 100 metric tons/year at full capacity. Selling price is INR 200/kg, production cost INR 50/kg, and annual fixed charges,…
  3. GATE 2021 CH Q23 (1 mark, Multiple choice) – Turnover ratio is defined as
  4. GATE 2021 CH Q64 (2 marks, Numerical answer) – Operating labor requirements L in the chemical process industry is described in terms of the plant capacity C (kg/day) over a wide range (103–106) by…
  5. GATE 2023 CH Q64 (2 marks, Numerical answer) – The purchase cost of a new distillation column is Rs. 10 lakhs with an installation factor of 5.8. The cost of the capital is to be annualized over a…
  6. GATE 2025 CH Q26 (1 mark, Multiple choice) – The capital cost (CC) of an industrial equipment varies with its capacity (S) as CC S. The rule-of-thumb value of the exponent is