Ore grades 58% and 62% Fe have net values₹4000 and₹4500/tonne. Net value varies linearly with grade. Waste mining costs₹1000/m³. Find the economic stripping-ratio relation SR in m³/tonne.

  1. SR=−3.250+0.125Fe
  2. SR=3.250+0.125Fe
  3. SR=3250+125Fe
  4. SR=−3250+125Fe

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: (A) SR=−3.250+0.125Fe

Explanation

Value slope is(4500−4000)/(62−58)=125 rupees/tonne per percentage-point Fe. The intercept is 4000−125×58=−3250. Dividing value by 1000 rupees/m³ waste cost gives SR=−3.250+0.125Fe, A.