GATE 2026 AR — Architecture – Question 61

Building Construction, Materials, and Structural Systems · Building construction techniques, methods and details: foundation, plinth, masonry, bonds, fenestrations, arches, scaffolding, formwork, timber/RCC/Steel frame construction, roof and roof covering · 2 marks · Multiple select

Which combinations correctly identify the parapet and terrace section labels?

Diagram for GATE 2026 AR — Architecture question 61
  1. P coping; R lime terracing; S rainwater pipe
  2. Q drip course; S rainwater pipe; T roof slab
  3. P vent pipe; Q drip course; R roof slab
  4. P vent pipe; R rainwater pipe; T roof slab

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: (A) P coping; R lime terracing; S rainwater pipe; (B) Q drip course; S rainwater pipe; T roof slab

Explanation

P caps and protects the parapet as coping; Q is the drip feature that interrupts surface water flow. R is the sloped terrace build-up, S the rainwater outlet/pipe and T the structural roof slab. Thus A and B are correct. Neither P nor R is the vent/rainwater component claimed in C, D.