GATE 2018 MN – Question 43
An SDL of 1.0 tonne capacity operates with a cycle time of 6 minutes. The dimension of
the face is 4 m x 3 m. Five blasts are conducted per shift with an average pull of 1.2 m. If
the density of blasted coal is 0.8 tonne/m3, the time required by the SDL in the shift to lift
all the prepared coal in hours is _________________.
Practise this question in The GATE Grind →
Show answer and explanation
Correct answer: 5.6 to 5.8