GATE Water and Waste Water Quality and Treatment: Primary, secondary and tertiary treatment, effluent standards – Previous Year Questions
7 GATE previous year questions on Primary, secondary and tertiary treatment, effluent standards (Water and Waste Water Quality and Treatment, Civil Engineering) with answers and explanations, from every paper.
- GATE 2023 CE (CE1) Q64 – The wastewater inflow to an activated sludge plant is 0.5 m3/s, and the plant is to be operated with a food to microorganism ratio of 0.2 mg/mg-d. The…
- GATE 2024 CE (CE2) Q60 – A circular settling tank is to be designed for primary treatment of sewage at a flow rate of 10 million liters/day. Assume a detention period of 2.0…
- GATE 2025 CE (CE2) Q62 – A community generates 1 million litres/day (MLD) of wastewater. This wastewater is treated using activated sludge process (ASP). The working volume of…
- GATE 2025 CE (CE1) Q45 – A facultative pond system is employed for wastewater treatment. Which of the following statements is/are true:
- GATE 2026 CE (CE2) Q29 – The grown algae are useful in the operation of
- GATE 2026 CE (CE2) Q64 – Anaerobic bacteria are being utilized for the destruction of biodegradable organic content of wastewater measured in terms of Chemical Oxygen Demand…
- GATE 2026 CE (CE1) Q25 – Which of the following components is/are NOT removed in the secondary treatment of sewage?