GATE Construction Management: Types of construction projects, estimation and costing, analysis of rates – Previous Year Questions

7 GATE previous year questions on Types of construction projects, estimation and costing, analysis of rates (Construction Management, Civil Engineering) with answers and explanations, from every paper.

7 questions worth 12 marks in all (2 1-mark, 5 2-mark). Asked between 2017 and 2024, so you can see how the topic has been tested over time.

  1. GATE 2017 CE (CE2) Q43 (2 marks, Multiple choice) – Consider: P. One-brick-thick walls are measured in square metres. Q. One-brick-thick walls are measured in cubic metres. R. No deduction in brickwork…
  2. GATE 2021 CE (CE2) Q53 (2 marks, Numerical answer) – Equipment costs ₹160000, salvage value ₹10000 and estimated life 5 years. Find difference between book values at end of year 4 using straight-line and…
  3. GATE 2021 CE (CE1) Q16 (1 mark, Multiple choice) – A contractor estimates direct and indirect project costs of ₹160000 and ₹20000. If markup is 10% of the bid price, the quoted price in rupees is
  4. GATE 2021 CE (CE1) Q40 (2 marks, Multiple choice) – Past ratios of Y’s bid price to X’s cost are 1.02,1.04,1.06,1.10,1.12 with frequencies 6,12,3,6,3. Based on these 30 bids, X’s probability of beating…
  5. GATE 2024 CE (CE2) Q47 (2 marks, Numerical answer) – The expression for computing the effective interest rate (i eff) using continuous compounding for a nominal interest rate of 5% is i eff = m (1 +…
  6. GATE 2024 CE (CE1) Q16 (1 mark, Multiple choice) – Consider the statements P and Q. P: Client's Preliminary Estimate is used for budgeting costs toward the end of planning and design phase. Q: Client's…
  7. GATE 2024 CE (CE1) Q51 (2 marks, Numerical answer) – The initial cost of an equipment is Rs. 1,00,000. Its salvage value at the end of accounting life of 5 years is Rs. 10,000. The difference in…