GATE 2021 MN – Question 44

Mineral Economics, Mine Planning, Systems Engineering · Mineral Economics · 2 marks · Multiple choice

Match roof-bolt cost/revenue lines: P line A, R line B, S line C, with 1 total cost, 2 indirect operating cost, 3 revenue.

Diagram for GATE 2021 MN question 44
  1. P–1;R–3;S–2
  2. P–2;R–1;S–3
  3. P–1;R–2;S–3
  4. P–3;R–1;S–2

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: (D) P–3;R–1;S–2

Explanation

Line A passes through the origin and grows with sales, representing revenue(3). Line B has an initial fixed-cost intercept plus variable cost, representing total cost(1). Horizontal C represents the stated indirect/fixed operating cost(2). Hence D.