- GATE 2022 CE (CE2) Q65 – The lane configuration with lane volumes in vehicles per hour of a four-arm signalized intersection is shown in the figure. There are only two phases:…
- GATE 2022 CE (CE1) Q62 – A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If…