GATE 2019 PI – Question 65

Industrial Engineering · Facility Design · 2 marks · Numerical answer

The layout for an AGV system is shown in the figure. The loading time is 0.5 minutes and the unloading time is also 0.5 minutes. All distances are in meters. Considering a vehicle velocity of 50 m/min, availability of 0.95 and traffic factor of 0.9, the number of vehicles required to satisfy a demand of 50 deliveries/hour is

Diagram for GATE 2019 PI question 65

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: 4 to 5

Explanation

We are sorry we couldn't write detailed soluition for this, we are working on it!, please consider asking your own AI, its just 2-3 clicks with very minimum effort