GATE 2026 CE (CE1) – Question 45
Select ALL CORRECT option(s) which can be considered to check whether the flexural stresses in a prestressed concrete beam are within the allowable stresses at the transfer and the service stages.
Practise this question in The GATE Grind →
Show answer and explanation
Correct answer: (A) Limiting zone for prestressing; (B) Magnel's graph; (D) Load balancing method
Explanation
The limiting zone, Magnel's graph and the load balancing method are all used to make sure the stresses at transfer and under service load stay within the permitted limits. The Hoyer effect describes how prestress is transferred to the concrete by bond in pre-tensioned members, so it does not check stresses.