GATE Urban Land Use and Transportation: Design of roads, intersections, grade separators and parking areas – Previous Year Questions
11 GATE previous year questions on Design of roads, intersections, grade separators and parking areas (Urban Land Use and Transportation, Architecture and Planning) with answers and explanations, from every paper.
- GATE 2022 AR — Planning Q26 – An off-street parking lot has 75 bays and serves 687 cars over 12 hours. Find average turnover in vehicles per hour per bay, to two decimal places.
- GATE 2022 AR — Planning Q52 – Identify the traffic interchange shown.
- GATE 2022 AR — Architecture Q26 – An off-street parking lot has 75 bays and serves 687 cars over 12 hours. Find average turnover in vehicles per hour per bay, to two decimal places.
- GATE 2023 AR — Planning Q49 – A residential project uses a 1 hectare plot and FAR 2.0. Parking is exempt from FAR. Provide one car per 100 m² of FAR-counted built-up area. Parking…
- GATE 2023 AR — Planning Q53 – What is the correct sequence in traffic-signal design?
- GATE 2023 AR — Architecture Q49 – A residential project uses a 1 hectare plot and FAR 2.0. Parking is exempt from FAR. Provide one car per 100 m² of FAR-counted built-up area. Parking…
- GATE 2024 AR — Planning Q41 – Which are physical components within a road right of way?
- GATE 2024 AR — Architecture Q41 – Which are physical components within a road right of way?
- GATE 2025 AR — Planning Q65 – The diagram shows an uncontrolled four-arm two-way junction. Each approach permits left, right and through movements, no U-turn. Find the maximum…
- GATE 2026 AR — Planning Q25 – A 15000 m² commercial property has two-thirds office space and one-third retail. Parking standards are 6 ECS/100 m² for offices and 4.5 ECS/100 m² for…
- GATE 2026 AR — Architecture Q25 – A 15000 m² commercial property has two-thirds office space and one-third retail. Parking standards are 6 ECS/100 m² for offices and 4.5 ECS/100 m² for…