Faces 1 and 2 can produce at most 1600 and 2000 tonnes/day, at Fe 63% and 58% and costs₹1500 and₹1200/tonne. Blend grade must be at least 60%, total demand at most 2500 tonnes/day, and sale price₹4500/tonne. Find profit-maximising outputs(1, 2).

  1. 1000, 1500
  2. 1333.3, 1166.7
  3. 1600, 900
  4. 500, 2000

Practise this question in The GATE Grind →

Show answer and explanation

Correct answer: (A) 1000, 1500

Explanation

Both faces have positive margin, so fill the 2500-tonne demand. Face 2 has the larger margin, so use the minimum face 1 amount needed for grade. Solve 63x+58(2500−x)≥60×2500, which gives x≥1000. Thus outputs 1000 and 1500 maximise profit, A, and remain within both capacity limits.