GATE Mineral Economics, Mine Planning, Systems Engineering: Systems Engineering – Previous Year Questions

23 GATE previous year questions on Systems Engineering (Mineral Economics, Mine Planning, Systems Engineering, Mining Engineering) with answers and explanations, from every paper.

  1. GATE 2021 MN Q34 (1 mark, Numerical answer) – Four independent components are connected in parallel, with reliabilities 0.40, 0.60, 0.50, 0.40. Find system reliability, to three decimals.
  2. GATE 2021 MN Q58 (2 marks, Numerical answer) – Of 25 roof-bolter operators, 13 were injured and 12 not injured. Of 107 loader operators, 35 were injured and 72 not injured. Find injury odds ratio…
  3. GATE 2021 MN Q60 (2 marks, Numerical answer) – A project has activities(duration days; predecessors): A(3; none), B(4; none), C(5; A, B), D(6; B), E(7; D), F(8; C, E), G(9; D), H(X; F, G). Total…
  4. GATE 2021 MN Q61 (2 marks, Numerical answer) – A truck travelling at x km/h consumes fuel at 20+x²/50 L/hour. Fuel costs₹70/L and other costs₹500/hour. It travels 100 km. Find the speed minimising…
  5. GATE 2021 MN Q62 (2 marks, Numerical answer) – Three cement factories supply 600, 100, 1000 t/day. Demands at D 1, D 2, D 3, D 4 are 700, 500, 300, 200 t/day. Unit transport costs are F 1:[20, 30,…
  6. GATE 2022 MN Q30 (1 mark, Numerical answer) – A safety device has independent critical components with failure probabilities 0.2 and 0.1. Failure of either or both can cause an accident. Find…
  7. GATE 2022 MN Q41 (2 marks, Multiple choice) – Choose a minimum-operating-cost dumper fleet. Type 1 costs ₹3 crore, carries 40 tonnes, makes 20 trips/day and costs ₹300/tonne to operate. Type 2…
  8. GATE 2022 MN Q65 (2 marks, Numerical answer) – PERT activities list predecessor→successor events and (pessimistic, most likely, optimistic) weeks: A 1→2(20, 15, 4), B 1→3(12, 8, 4), C 2→3(16, 11,…
  9. GATE 2023 MN Q19 (1 mark, Multiple choice) – Maximise Z=4x 1+2x 2 subject to 2x 1-2x 220, 4x 180, and x 1,x 20. Classify the solution.
  10. GATE 2023 MN Q22 (1 mark, Multiple choice) – Which statement about classical project scheduling techniques is correct?
  11. GATE 2023 MN Q36 (2 marks, Multiple choice) – Fixed-carbon control limits are 40%±15% at 3σ. Rule 1: four of five successive readings on the same side of the mean, more than 1σ away, indicate loss…
  12. GATE 2023 MN Q54 (2 marks, Numerical answer) – A pump has reliability R(t)=[-(t/1000)0.5], where t is in years. If it comes with a six-month warranty, find the number of years for the pump to…
  13. GATE 2023 MN Q57 (2 marks, Numerical answer) – Three mines supply four washeries. Unit transportation costs for (W1, W2, W3, W4) are M1:(19, 30, 50, 10), M2:(70, 30, 40, 60), M3:(40, 8, 70, 20).…
  14. GATE 2023 MN Q58 (2 marks, Numerical answer) – Assign four tasks T1–T4 to four machines, one per machine. Costs by machine are M1:(10, 40, 60, 30), M2:(90, 70, 100, 90), M3:(40, 50, 110, 70),…
  15. GATE 2023 MN Q59 (2 marks, Numerical answer) – Consecutive accident intervals in days are 10, 15, 6, 18, 12, 14, 16, 9, 21, 15, 26, 18, 22, 25, 13. Fit an exponential distribution and find the…
  16. GATE 2024 MN Q19 (1 mark, Multiple choice) – An M/M/1 shovel queue has arrival rate 9 dumpers/hour and service rate 12/hour. Find probability that exactly one dumper is in the system.
  17. GATE 2024 MN Q20 (1 mark, Multiple choice) – The project network is shown. Activities A, B, C, D, E have durations 5, 6, 8, 3, 4 weeks and crash costs 4, 2.5, 2, 3, 4 lakh rupees/week…
  18. GATE 2024 MN Q36 (2 marks, Multiple choice) – Faces 1 and 2 can produce at most 1600 and 2000 tonnes/day, at Fe 63% and 58% and costs₹1500 and₹1200/tonne. Blend grade must be at least 60%, total…
  19. GATE 2024 MN Q46 (2 marks, Numerical answer) – The conveyor network has two independent parallel belts before an ore bin and two independent parallel belts after it, as shown. Every belt has…
  20. GATE 2025 MN Q37 (2 marks, Multiple choice) – Transportation costs to Mines1,2,3 are supplier S:(10,15,50),O:(5,2,100),I:(30,40,20) rupees/tonne. Supplies are2500,2500,3000 tonnes;…
  21. GATE 2026 MN Q31 (1 mark, Numerical answer) – Activities in the project network are labelled(expected days,standard deviation in days). Find the standard deviation of project completion time to…
  22. GATE 2026 MN Q42 (2 marks, Multiple choice) – Dumpers arrive exponentially at5/hour and loading times are exponential. Waiting cost is₹200 per dumper-hour. Shovels S1,S2,S3,S4 have operating…
  23. GATE 2026 MN Q47 (2 marks, Numerical answer) – Assign four jobs J1–J4 to engineers S1–S4, one job each. Costs by row are S1:(50,50,unavailable,20); S2:(70,40,20,70); S3:(90,30,50,unavailable);…