GATE Project Management and Professional Practice: Estimation, costing and specification – Previous Year Questions
14 GATE previous year questions on Estimation, costing and specification (Project Management and Professional Practice, Architecture and Planning) with answers and explanations, from every paper.
- GATE 2021 AR Q63 – A room is 1.8×2.4 m internally. Ceramic tiles are 300×300 mm. A 900 mm door is flush with the internal wall face and has no skirting across its…
- GATE 2022 AR — Planning Q47 – A 230 mm thick brick wall is 10 m long and 3 m high, built in Flemish bond from 230×112.5×70 mm bricks with 5 mm mortar joints. Estimate required…
- GATE 2022 AR — Planning Q48 – The reflected roof plan and section show a 10 m×10 m RCC roof, 150 mm slab, with 300 mm wide beams 600 mm deep including slab, equally spaced…
- GATE 2022 AR — Architecture Q47 – A 230 mm thick brick wall is 10 m long and 3 m high, built in Flemish bond from 230×112.5×70 mm bricks with 5 mm mortar joints. Estimate required…
- GATE 2022 AR — Architecture Q48 – The reflected roof plan and section show a 10 m×10 m RCC roof, 150 mm slab, with 300 mm wide beams 600 mm deep including slab, equally spaced…
- GATE 2023 AR — Planning Q45 – Eight classrooms each measure 15 m×10 m×4 m high. Paint the four internal walls, deducting 10% for openings. Base and finish coats require 4.5 and 2.5…
- GATE 2023 AR — Architecture Q45 – Eight classrooms each measure 15 m×10 m×4 m high. Paint the four internal walls, deducting 10% for openings. Base and finish coats require 4.5 and 2.5…
- GATE 2024 AR — Architecture Q63 – The two-room foundation excavation shown has uniform trench width 1.10 m and cumulative centreline length 41.10 m. Concrete depth is 0.30 m. Find…
- GATE 2025 AR — Planning Q29 – Match P honeycomb brickwork, Q steel reinforcement, R brick-on-edge work, S excavation with 1 running metre, 2 cubic metre, 3 square metre, 4…
- GATE 2025 AR — Planning Q41 – A semicircular arch has 2 m clear span, 30 cm radial thickness and 40 cm wall breadth. Find brickwork volume in m³, to two decimals.
- GATE 2025 AR — Architecture Q29 – Match P honeycomb brickwork, Q steel reinforcement, R brick-on-edge work, S excavation with 1 running metre, 2 cubic metre, 3 square metre, 4…
- GATE 2025 AR — Architecture Q41 – A semicircular arch has 2 m clear span, 30 cm radial thickness and 40 cm wall breadth. Find brickwork volume in m³, to two decimals.
- GATE 2026 AR — Planning Q44 – An RCC stair flight has 10 steps, each 150 mm rise and 300 mm tread, over a 75 mm waist slab. Width is 1500 mm. Steel is 0.75% of total RCC volume and…
- GATE 2026 AR — Architecture Q44 – An RCC stair flight has 10 steps, each 150 mm rise and 300 mm tread, over a 75 mm waist slab. Width is 1500 mm. Steel is 0.75% of total RCC volume and…