GATE Hydrology: Reservoir capacity, flood estimation and routing, surface runoff models – Previous Year Questions
15 GATE previous year questions on Reservoir capacity, flood estimation and routing, surface runoff models (Hydrology, Civil Engineering) with answers and explanations, from every paper.
15 questions worth 18 marks in all (12 1-mark, 3 2-mark). Asked between 2016 and 2026, so you can see how the topic has been tested over time.
- GATE 2016 CE (CE1) Q25 – Match flood-routing methods P hydrologic and Q hydraulic with equations 1 continuity, 2 momentum and 3 energy.
- GATE 2018 CE (CE2) Q35 – A culvert has design flood return period 100 years and useful life 20 years. Its design risk, to two decimals, is %.
- GATE 2018 CE (CE1) Q34 – Muskingum routing coefficients C₀ and C₁ are −0.25 and 0.55. The third coefficient C₂ is .
- GATE 2019 CE (CE2) Q24 – Reservoir routing converts an inflow hydrograph with peak P I at time t I to outflow with peak P O at time t O. Which relationship is correct?
- GATE 2019 CE (CE1) Q33 – The probability that annual maximum flood discharge exceeds 25000 m³/s at least once in the next five years is 0.25. Find the flood’s return period…
- GATE 2020 CE (CE2) Q22 – Muskingum method is used in .
- GATE 2020 CE (CE1) Q28 – Find probability that a 50-year flood does NOT occur at all during 25 project years, to two decimal places.
- GATE 2022 CE (CE2) Q34 – A flood-control structure has life n years and design flood return period T years. For T=n and n, find hydrologic failure risk (%) to one decimal.
- GATE 2025 CE (CE2) Q26 – In the context of the effect of drainage density on the run-off generation and the hydrograph at the catchment outlet, all other factors remaining the…
- GATE 2025 CE (CE1) Q20 – To derive the total flood hydrograph at a catchment outlet from an isolated storm, the order in which the following methods are applied, from the…
- GATE 2025 CE (CE1) Q34 – A water resources project with an expected life of 25 years has to be designed for an acceptable risk of 5% against a design flood. The return period…
- GATE 2026 CE (CE2) Q32 – The probability (in %) that a storm having return period of 15 years may occur in the next 10 years is (*rounded off to two decimal places*).
- GATE 2026 CE (CE2) Q43 – Types of flood routing and methods are given in the table below. Column 1: Type of Flood Routing Column 2: Method --- --- (P) Hydrologic routing (i)…
- GATE 2026 CE (CE1) Q55 – A bridge with an expected life of 50 years is designed for a flood of 10000 m3/s corresponding to the return period of 100 years. The risk associated…
- GATE 2026 CE (CE1) Q64 – The intensity-duration relationship for a rainfall on a rectangular plot ABCD of area 7 ha (1 ha = 104 m2) can be modelled by the following equation:…