GATE Hydrology: Reservoir capacity, flood estimation and routing, surface runoff models – Previous Year Questions
7 GATE previous year questions on Reservoir capacity, flood estimation and routing, surface runoff models (Hydrology, Civil Engineering) with answers and explanations, from every paper.
- GATE 2025 CE (CE2) Q26 – In the context of the effect of drainage density on the run-off generation and the hydrograph at the catchment outlet, all other factors remaining the…
- GATE 2025 CE (CE1) Q20 – To derive the total flood hydrograph at a catchment outlet from an isolated storm, the order in which the following methods are applied, from the…
- GATE 2025 CE (CE1) Q34 – A water resources project with an expected life of 25 years has to be designed for an acceptable risk of 5% against a design flood. The return period…
- GATE 2026 CE (CE2) Q32 – The probability (in %) that a storm having return period of 15 years may occur in the next 10 years is (*rounded off to two decimal places*).
- GATE 2026 CE (CE2) Q43 – Types of flood routing and methods are given in the table below. Column 1: Type of Flood Routing Column 2: Method --- --- (P) Hydrologic routing (i)…
- GATE 2026 CE (CE1) Q55 – A bridge with an expected life of 50 years is designed for a flood of 10000 m3/s corresponding to the return period of 100 years. The risk associated…
- GATE 2026 CE (CE1) Q64 – The intensity-duration relationship for a rainfall on a rectangular plot ABCD of area 7 ha (1 ha = 104 m2) can be modelled by the following equation:…