GATE Industrial Engineering: Work System Design – Previous Year Questions
13 GATE previous year questions on Work System Design (Industrial Engineering, Production and Industrial Engineering) with answers and explanations, from every paper.
- GATE 2021 PI Q50 – Five observed spot-welding times are 40,35,45,37,43 seconds. Standard time is 45 s and allowance is 9 s. Find operator performance rating in percent…
- GATE 2022 PI Q21 – Match the shown therblig symbols P,Q,R,S with meanings 1: rest to overcome fatigue; 2: avoidable delay; 3: inspect; 4: search.
- GATE 2022 PI Q60 – Observed machining-cycle times 42,43,44,45,46 minutes have frequencies 1,2,3,2,1 respectively. Worker rating is 110%. Find standard time with 10%…
- GATE 2023 PI Q29 – Standard time per machine job is 10 min. Five machines are each available 300 hours/month with average utilization 80%. Find maximum monthly…
- GATE 2023 PI Q42 – Match recording methods P: outline process chart; Q: string diagram; R: multiple activity chart; S: two-handed process chart, with applications 1:…
- GATE 2023 PI Q50 – A work-sampling study with 100 observations found 25% worker idle time. Find the number of observations required for ±10% accuracy at 95.45%…
- GATE 2024 PI Q21 – Which therblig does not advance work and can be eliminated through motion economy?
- GATE 2024 PI Q22 – With many work-sampling observations, which distribution estimates required sample size?
- GATE 2024 PI Q61 – A packaging worker rated 120% takes an observed average nine minutes. Allowances are 10% of standard time. Find standard time (integer minutes).
- GATE 2025 PI Q19 – A worker is idle in x of n work-sampling observations. Find the standard deviation of estimated mean idle proportion.
- GATE 2025 PI Q48 – A worker receives 30 minutes personal allowance during an eight-hour shift. Normal product time is five minutes. Find standard time (integer seconds).
- GATE 2026 PI Q50 – The two-hand operation chart shown describes nut-and-bolt assembly by a left-handed operator. Which ONE OR MORE statements are correct?
- GATE 2026 PI Q62 – A job has elements A,B, each observed three times. A times are 20,25,21 s with 105% rating; B times are 19,17,18 s with 90% rating. Add 20%…