GATE Production Planning and Control: Aggregate production planning, scheduling and material requirement planning – Previous Year Questions
10 GATE previous year questions on Aggregate production planning, scheduling and material requirement planning (Production Planning and Control, Mechanical Engineering) with answers and explanations, from every paper.
10 questions worth 18 marks in all (2 1-mark, 8 2-mark). Asked between 2017 and 2026, so you can see how the topic has been tested over time.
- GATE 2017 ME (ME1) Q62 – Four jobs P, Q, R, S are available together for one machine. Their processing times are 15, 9, 22 and 12 days respectively. Find the shortest possible…
- GATE 2018 ME (ME1) Q62 – Six jobs have (processing time including setup; due date) in days: A (3;8), B (7;16), C (4;4), D (9;18), E (5;17), F (13;19). Using shortest…
- GATE 2020 ME (ME2) Q23 – In Materials Requirement Planning, inventory holding cost is very high and setup cost is zero. Which lot-sizing approach should be used?
- GATE 2021 ME (ME2) Q39 – A factory produces m (i=1,2,,m) products, each of which requires processing on n (j=1,2,,n) workstations. Let a ij be the amount of processing time…
- GATE 2021 ME (ME1) Q38 – A set of jobs A, B, C, D, E, F, G, H arrive at time t = 0 for processing on turning and grinding machines. Each job needs to be processed in sequence…
- GATE 2022 ME (ME2) Q41 – Parts P1-P7 are machined first on a milling machine and then polished at a separate machine. Using the information in the following table, the minimum…
- GATE 2022 ME (ME1) Q42 – Activities A to K are required to complete a project. The time estimates and the immediate predecessors of these activities are given in the table. If…
- GATE 2022 ME (ME1) Q59 – The product structure diagram shows the number of different components required at each level to produce one unit of the final product P. If there are…
- GATE 2024 ME Q34 – A set of jobs U, V, W, X, Y, Z arrive at time t = 0 to a production line consisting of two workstations in series. Each job must be processed by both…
- GATE 2026 ME Q47 – Four jobs are on order in a factory. As on day 20 of the production calendar, the corresponding due date and work remaining to complete these jobs (in…